
INSTALLER’S GUIDE
Page 23
Figure 20. Lower Cable Retention
Figure 19. Floor Fixing
Figure 18. Cable Route
6. Thread the cables through the eyebolts. Return the
cables through the holes near the bottom of the hotbox
back panel, (For precast or clay block flue systems
return the cables through the slotted holes in the side
of the hotbox), and through the “V” shaped brackets
near the bottom front sides of the hotbox - See figure
18.
7. Place the hotbox fully back into the fireplace opening
so that it is sealed against the fireplace front surround.
8. Drill a hole into the fireplace floor through each of
the two holes in the base of the
hotbox using a no.12 masonry drill.
See figure 19.
9. Insert a fibre plug into each hole.
Use the fibre supplied with this
appliance - Never use plastic plugs
instead of the fibre plugs supplied.
Fit a woodscrew in each plug and
tighten.
Always screw the base into position
before applying tension to the cables.
This will ensure a tight seal between
the top of the hotbox and wall
10. Fit a cable retainer over the bottom
end of each cable.
11. Pull each cable taut. Push the cable
retainers hard up against the “V”
brackets. Tighten the screws in the
retainers so that they clamp the cables in
position. Apply tension to the cables by
turning the hexagonal adjusters by hand.
See figure 20.
12. Inspect the installation of the hotbox
against the fireplace surround. If the
hotbox is aligned squarely and the sealing is satisfactory, fully tighten the cable retainers.
13. If the hotbox is not correctly aligned, release the tension on the cables by slackening
the screws and turning the hexagonal adjusters fully anticlockwise. The hotbox should
Comentarios a estos manuales